loading
Slip on flange
The Slip-on flange has a low hub because the pipe slips into the flange prior to welding.
It is welded both inside and out to provide suffcient strength and prevent leakage.Slip-on flanges are all bored slightly larger than the O.D. of the pipe. They are preferred over welding neck flanges bu many users due to their lower intial cost, but final intallation cost is probably not much less than that of the welding neck flange because of the additional welding involved.
Advantages of slip on flanges:
Low cost installation
Less time needed to spent on ensuring the accuracy of the cut pipe
They are somewhat easier to align
The slip-on flanges have low hub because the pipe slips into the flange before welding
The flange is welded both inside and outside to provide sufficient strength
They prevent leakage
SOH Flange SO Flange Weight SO Flange Demensions SO Flange 150 Slip On Pipe Flange Slip On Flange Raised Face
Standards, Dimensions & Weight
ASME/ANSI B16.5 Class 150 SO
ASME/ANSI B16.5 Class 300 SO
ASME/ANSI B16.5 Class 600 SO
ASME/ANSI B16.5 Class 900 SO
BS 3293 Class 150 SO
BS 3293 Class 300 SO
BS 3293 Class 600 SO
DIN 86029 PN 10
4 products found
JS FITTINGS provides SABS Flanges for the Petrochemical, Process, Waterworks industries in Carbon Steel
Carbon steel pipe flanges manufacturers with certificates of ISO 9001, EN 10204-3.1, EN 10204 - 3.2, TUV supplier assessment.
ASTM A105 forged flanges made by JS FITTINGS with perfect quality and competitive factory price.
Carbon steel A105 flanges using for pipeline conection. Use on GAS ,OIL ,water pipeline etc.
- Become A JS FITTINGS Customer
- Please send your message to us
STEEL FITTINGS FOR PIPE CONNECTION
The professional manufacturing capacity of JS FITTINGS strongly guarantee the high-quality products, competitive price and short delivery time.
-
Free samples can be supplied. Customers need to pay for the courier cost, which will be returned in the following orders.
-
All your inquiries will be replied in 2 hours and quotations will be supplied within 24 hours.
-
Once the deposit is received during the contract valid time , JS FITTINGS will take full responsibility and obligation for accomplishment of the Contract.
-
The urgent order with 100% prepayment has the priority of delivery.
Get A Quote
Interested in the following live? Get in touch with us, now!
- *Name
- *Tel
- *Title
- *Content