Home / All
FAQs
- Differences between seamless elbows and welded elbows[2020/7/8]
- How do the ASME B 16.9 60 inch pipe elbows be made?[2020/5/7]
- FAQs about cooperation during virus-COVID-19[2020/2/28]
- Types of steel pipe flanges[2020/1/13]
- Differences between steel pipe bends and pipe elbows[2019/12/31]
- Advantages and Disadvantages of Socket Weld fittings[2019/12/11]
- Steel Pipe Dimensions - Schedule 80[2020/1/8]
- Steel Pipe Dimensons - Schedule 40[2020/1/8]
- ASME/ANSI B16.5 flange and bolt demisions[2019/11/21]
- What's the features of seamless carbon steel tee fittings and pipe reducers?[2019/11/6]
- The key step in the production of butt flanges - annealing[2019/10/31]
- Industrial Pipe Fittings Standards[2019/10/31]
- About JS FITTINGS MS/CS pipe fittings[2019/10/18]
- JS FITTINGS can supply other kind of pipe fittings--Forged Steel Fittings[2019/10/18]
- Flange connection types[2019/9/25]
- Seamless pipe fittings Characteristics[2019/9/25]
- What is the most effective inspection method for welded pipe elbow?[2020/6/12]
- Why does the tees need to do the blasting before painting?[2019/9/25]
- Production Process of steel Pipe Tees[2019/9/25]
- How to carry out anti-rust work for carbon steel pipe fittings after production.[2019/9/25]
- General application of pipe flanges[2019/9/25]
- why the steel pipe fittings and flanges is necessary in the construction?[2019/9/25]
- The reason why the welding Tees were fracture during working[2020/6/12]
- what's the standard weight of ASME B 16.47 SER.B (API 605) HG 20625?[2019/9/25]
- How to get the samples of pipe fittings?[2019/9/25]
- What's the difference between the butt weld pipe fittings and socket fittings[2019/9/25]
- Become A JS FITTINGS Customer
- Please send your message to us
STEEL FITTINGS FOR PIPE CONNECTION
The professional manufacturing capacity of JS FITTINGS strongly guarantee the high-quality products, competitive price and short delivery time.
-
Free samples can be supplied. Customers need to pay for the courier cost, which will be returned in the following orders.
-
All your inquiries will be replied in 2 hours and quotations will be supplied within 24 hours.
-
Once the deposit is received during the contract valid time , JS FITTINGS will take full responsibility and obligation for accomplishment of the Contract.
-
The urgent order with 100% prepayment has the priority of delivery.
Get A Quote
Interested in the following live? Get in touch with us, now!
- *Name
- *Tel
- *Title
- *Content